Friday, July 28, 2023

Required Volume Needed for Rinnai 199iN

The following is publicly available information for the Rinnai RU199iN tankless water heater and analysis to determine the volume of air required for venting

Thursday, December 9, 2010

Final Write-up: The Evolution of McMansions to Sustainable Design

Residential Construction

Growing up in the 80's and 90's, I remember seeing houses get larger and larger by the year.  Some call it the era of the McMansions.  People were making money and building bigger.  There was one house in my neighborhood that had an indoor pool, tennis courts, an outdoor pond and guest house, lots of land and way too many bedrooms and bathrooms.  I can't imagine what it cost to keep the property up, including the landscaping which was a large undertaking.  And you ask how many people lived on this property?  Three.  However, as our economy is changing and jobs are less abundant, so are the larger houses.  People are worried about their position in the next economic downturn, especially after experiencing the stock market crash of March, 2008.   The "more is better" mentality is out, and smaller, more economical green homes are in.  Families can take advantage of every square foot of their home and see to it that every square foot has a purpose.  Using natural resources, such as sunlight, wind, and rain and converting these into energy is efficient, cost saving, and the future of building construction.

Today, instead of building an extra room for an office, people are doubling up an extra room as a guest room/home office.  Builders are building larger open rooms, giving the owner the effect of having more space.  The kitchen, dining room, and family room are all consolidated into one big open room, making the rooms and family more cohesive and interactive.  This takes away the formal dining room that sits in emptiness 90% of the time going unused.  Garages are being built behind our homes and front porches are extending around the front of the house to give the owner the perception of a more expansive living space in a smaller more economically sized house.

The neighborhoods are also effected by this downsizing.  Along with building smaller houses, the property is also getting smaller.  The neighborhoods are becoming more cohesive in that everyone will share a large park to make up for their small yard.  My sister and brother-in-law live in a neighborhood in Blacksburg, VA and have a smaller property than what they had before.  However, they pay a monthly fee to the neighborhood association who maintain property such as trails and parks in and around the neighborhood.  The median running down the middle of the neighborhood is open and has a nice gravel trail running down the center.  There are also two parks for kids to play in with slides, swings, and even a small soccer field.  Another interesting concept is an outdoor theater with seating made out of large boulders and a large tree cut in half.  The side of a large hill was cut out and makes for great acoustics.  It's a very comfortable and private place located in the woods surrounding the community.  The benefits of the above mentioned amenities is that they are available to everyone living in the community, they create a more cohesive and intertwined community, they are maintained by hired landscapers, and there is less acreage that the homeowner has to maintain.  The downside is the monthly fee paid to the community, but given that the owner is maintaining less property, chances are that you save money in the long run, so the benefits outweigh the costs.

Commercial Construction

Looking around at construction sites, current and completed, sustainability is becoming a more common theme.  From the ICTAS II building which we have thoroughly studied for Integrated Lab (BC 2064) to the Academic and Student Affairs Building, both have incorporated green construction and sustainable designs into the development and construction.  This is not only a trend, but it is the future of commercial building construction.  Virginia Tech is a University that professes "Invent The Future" and it is indeed looking into the future and setting the example for future practices in building construction.

The new Institute for Critical Technology and Applied Science II (ICTAS II) at Virginia Tech is following this trend by introducing bioretention, which is the process of filtering stormwater runoff using microbes in plants and soils to remove pollutants through a variety of physical, chemical, and biological processes http://www.smithgroup.com/?id=1343.
Artist's rendering of rain garden in front of ICTAS II.
 
The rainwater will be stored and filtered in cells  to a depth of six inches and in severe storms will discharge into spill ways.   The whole process can be viewed by students and faculty from the garden.

Much like the ICTAS II building, the Academic and Student Affairs Building will also incorporate a rain garden and a green roof.  I was unable to find information on the green roof itself, but after doing some research on green roofs earlier in the semester, the benefits include filtering out the pollutants in rainwater, reducing stormwater runoff, and the reduction of cooling loads on building by fifty to ninety percent.  With Blacksburg's climate this won't play as much as a factor as it would in a hot/dry climate such as Arizona, but is still cost efficient.  Evaporative cooling is the cooling of air through the evaporation of water.  Both simple and cost effective. 

Since Sustainable Design is new, the economical costs are greater than your average building with no "green" design because of the extra time spent in design/development and research, but the ecological benefits could far outweigh the economical costs in the long run.  Eventually sustainable design will be the norm and there will be more engineers, architects, and contractors with the know-how driving sustainable design price down.  The basic economics of supply and demand:  As the quantity desired by the buyers rises, the more firms specializing in sustainable design and supply will be offered in the market, thus increasing competition and driving the prices down.  This will be good in that the practice will be more common among builders.  The benefits of sustainable design include better air quality, better quality of life, and reduced health impacts.  Although the price is high now, in the long run the costs will disappear into a better quality of life.

Visitors and Undergraduate Admissions Center

The Visitors and Undergraduate Admissions Center is going sup next to The Inn at Virginia Tech.  It's a $10 million project and will accommodate the growing needs of visitors to the campus and university admission's office.  The building is sitting on a slab-on-grade, with structural steel framing members.  The interior walls are light gauge steel framing.  Below is a picture of a prefabricated interior wall section similar to that in Bishop-Favro Hall 230, which separates the classroom from the entryway and atrium.  Gypsum Wall Board panels will more than likely be placed in the middle with glass windows being installed on the top four cutouts.  

Interior Wall Section

Exterior Wall Cladding.

  
Workers installing precast concrete panels to exterior of building.

Sectional View of Precast Concrete Panel Cladding.  Stainless steel connection anchors have been embedded into the panels during manufacturing and are ready to be hoisted and anchored immediately to the structural steel member, concrete columns, and concrete slabs, or backup walls.
The backup wall for the precast concrete panels is an insulated, metal stud back-up wall assembly that is covered with a waterproofing membrane, such as rolled on tar.  The joints must prevent leakage from rain and also be able to withstand thermal expansion and structural movement, as discussed in class.  The PC panels will have no structural loads other than its own weight and the loads of wind and seismic activity. 

Sunday, December 5, 2010

Academic and Student Affairs Bldg (cont.)

I hope to continue a progress report on the Academic and Student Affairs Building, but this will be my last past for the BC2024 Fall class.  They are near completion of the front entrance retaining wall, which will be backfilled to street level.  Work is continuing on the foundation wall for the building's footprint and I noticed that today, concrete masonry units were delivered to the site. 

Something that I noticed along the the slab that the retaining wall sits on was a long open key hole formed out of the slab that was formed out between the vertical rebar for the wall.
Highlighted in red, which is difficult to see exactly what I'm explaining, but I'll include a sketch to give a better illustration.  Chapter 19, Concrete Construction, in the Building Construction, Principles, Materials, and Systems explains this as a relief joint because (a) it is difficult to match colors between two concrete placements, and (b) the top surface of the lower concrete may not be perfectly level, resulting in an irregular construction line, or it may be slightly out of plane with the adjacent concrete.  The latter (b) makes sense in this situation given that this will be backfilled, aesthetics do not apply.  This key will also give the concrete a good seat to set in when it is poured and the connection will be better than that of a flat connection.  Below the key joint is a horizontal dowel joint which will connect the existing slab to the newly poured slab.  Usually spacing for these joints is between 10-15 feet.

Upon further examination, I determined that this was a shear key that resists lateral forces such as earth and water pressures, wind, and earthquakes, ensuring wall stability.  Rebar is placed vertically on both sides of the shear key.  See illustration below.

http://www.concretees.com/people/bruce/pubs/C870620.pdf
 

Tuesday, November 23, 2010

Foundation Wall (Student Affairs Bldg)

Worker using the concrete washout (or lack thereof) after pouring the concrete foundation walls.  This could be a designated concrete washout pit, but what confuses me is the randomness of washing out next to 3 caisson holes that have been drilled (covered with boards).      

Beginning of foundation wall being formed and poured.  Notice the backhoe in the foreground digging a trench for a water main.    
On the floor plan (artist's rendering) located on VT's website (http://www.pdc.facilities.vt.edu/mediawiki/index.php/File:Acad_Stu_Afrs_Aug_09_Page_2.jpg), the area where they are currently forming up and pouring is the service area of the building and possibly part of the dining and circulation area.   

Storage of rebar that will be hoisted over by crane for the foundation wall (previous picture).


Foundation wall form work and finished pour.

New River Bank

House located to the left of Cabo Fish Taco on Main St.  No workers or contractors were located at the site during my visit.  Notice the "No Trespassing" sign on the left.

Rear of the house.  Notice the original concrete foundation wall, with the new addition of CMU's placed on top.  An opening is pictured here, giving me the idea that this may be construction for a basement addition. 

Formwork (snap ties).  Snap ties keep the formwork at a predetermined distance, while also reinforcing the concrete. 

Formwork for placement of concrete foundation wall.
Formwork for foundation wall.  As you can see the house has been jaceked up a good 4-5 feet.
Above is a picture of an old house on Main Street that has been jacked up above the existing foundation.  From the construction, it appears that a basement is being added, possible for more office space.  I was thinking since it is a bank, possibly a vault will be installed and reinforced in the basement of the house.  Also, attached are some pictures to give you a better picture of what is going on.