Friday, September 10, 2010

901 Kent Drive (Residential)

I have been following this single family home since the Summer II session and the house is nearing completion.  Tyvek house wrap has been installed around the home and masons are laying the brick veneer.  All mechanical and electrical systems have been installed.  This house has taken approximately three months to complete - the foundation was laid in mid July.    

Vaulted Ceiling in Master Bedroom (2nd floor, left side of house).  Electrical and Mechanical systems have been installed and house is ready for Gypsum Wallboard to be installed. 
Masons laying brick veneer on the front side of the house.  Bricks were delivered on site days in advance.  Masonry saw located on site to cut brick. 

Brick Veneer awaiting the masons to lay on the back side of the house.  Worker had a tool that would pick up multiple bricks at a time to carry over.  "Backbreaking" work and I'm sure they will also use the telescopic lift to get the bricks up onto the scaffolding to the second floor and above.

No comments: