After excavation of the southern side of the site, the hill was covered with tyvek or similar material to combat erosion and keep the hill intact while the retaining wall is formed at placed. Below are pictures of the southern side.
Workers splicing column rebar into the piers/caissons that have been drilled. |
Caisson/Pier formwork |
Slab has been poured for the southernmost retaining wall. Columns have been spliced/tied into the caissons and safety caps have been placed on all rebar. |
Continued forming of slab formwork and working mucking out the caisson hole with shovel and airhose. |